Ground Work Engineering Construction Project

Since its inception in 2007, ORISSA BORE WELL. has been involved in numbers of significant pile foundation works of

  • Bored piles (Drilled Shaft) through DMC typhoid rig.
  • TMR (Truck mountain rotary rig) any kind of soft soil.
  • shoring pile.
  • Driven Piles (Reinforced Concrete and Spun).
  • Micro Piles and deep open excavation for measure commercial and industrial project.
  • Marine Structure piles and Steel ‘H’ piles.

Our piling core competence is currently Building Construction Authority, measure bridge , ROB, FOB and river bed tower line foundation project work.